Complete upgrade of the gas piping system at Belvedere East and West in Jackson Heights Historic District in Queens.
New gas main throughout the cellar. Existing individual gas lines were removed.
Installation of twin-set master meter for Belvedere East.
Individual gas meters were removed to convert to a master meter system for each building.
New gas branch piping was run through kitchen cabinetry to reduce demolition costs or costs associated with removing countertops and cabinetry and putting them back in place.