Completed Capital Improvement Program for Franklin Plaza Apartments; a residential cooperative complex comprised of 14 buildings, each 20 stories tall, in East Harlem.
Installation of a new heating plant boiler plant, which serves eight buildings. The three new boilers are equipped with dual fuel burners which burn cleaner no. 2 fuel oil and gas.
Before photo of the roof and roof railing before roof and railing replacement program.
All new roof system and railings installed at each of the complex's 14 buildings.
Before photo of the water tower enclosure with cracked, spalling, and defective exterior brickwork.
Main roof replacement and water tower enclosure repair work completed.