Resources
Resources Topic: Capital Planning and Project Management
Results found:
-

Interior Renovations
An engineer/architect should review proposed alternations to make sure they don’t damage building-wide systems.
-

Project Communication
Establishing upfront a realistic scope of work, repair budget, and timeline paves the way to a smoother running project.
-

Exterior Repair Contracts
Owners should insist on a formal agreement specifying guarantees, payments schedule, liquidated damages, and insurance.
-

High Bid, Low Bid, Best Bid?
For a competitive bid, get itemized repair components, check references, and never reveal your budget to contractors.
-

Contractor Quality
References alone aren't sufficient. Ask prospective contractors the right questions before hiring one.
-

When an Engineer Is on the Board
An engineer can provide valuable technical input, but he or she does not run the project.
-

Getting the Construction Documents Right
Plans and specifications for a revived project need to be updated if the scope of work has changed.
-

Time for a Change (Order)?
Change orders are inevitable, but which ones are legitimate, and how much should be allotted for them?
-

When to Use an Engineer
An Engineer’s role is to determine how to make the most cost-effective repairs.
-

Engineer vs. Architect: What’s the Difference?
A licensed professional’s practical experience with the type of project at hand is the key consideration.
-

To Bond, or Not to Bond?
Performance bonds can offer a measure of financial protection for owners undergoing construction projects.
-

Is “Subcontractor” Really a Dirty Word?
Sometimes hiring subcontractors is not only appropriate but advisable—with precautions.
-

The Role of the Engineer/Architect
Common misconceptions that strain the partnership between a board and its engineer/architect.
-

Altering Your Building: It’s Not Just an Ordinary Facelift
Major projects can turn into major headaches if not done with the help of licensed professionals.
-

Establishing a Reliable Repair Budget
Itemizing anticipated funding requirements gives building owners greater repair options.
-

Don’t Fall Short with Long-term Planning
Avoid emergency repairs and expenses with a preventative maintenance program.
-

8 Steps to a Successful Project
Liquidated damages, retainage, and six other things to minimize construction problems.
-

Apartment Alterations
RAND Senior Architect Suzanna Takayama, RA discusses what should be reviewed when residents propose alterations to their apartments.
-

Construction Contracts
RAND President Stephen A. Varone, AIA discusses how to get an owner-contractor agreement done in an effective and efficient manner.
